中文版 | English | Site Map

Chongqing Central Business District

Date:2011/2/23 From:AetClose

      September 2010. Supply of Automatic Tube Brushing Systems awarded to Asia Energy. The project consists of 7 chillers, 3 units for Cooling and Heat Pump duty and 4 units for Thermal Storage and cooling duty. A total of 10 valves were supplied 4 of the valves were rated at 20bar to deal with the high system static head and the remaining 6 rated at 10bar. The selected chillers were supplied by Trane. Asia Energy Tech worked closely with the owner, the designer and Trane to ensure that the supply of the systems went smoothly. Tube brushes and baskets were fitted in Trane factory before the chillers were tested thereby ensuring flows and pressure drops over the vessels were not affected by the tube brush system.

ATB was chosen because of the poor river water quality and because only ATB guarantees every tube will be brushed clean at every cycle. ATB is also the only supplier who guarantees the baskets for 20 years and the Du-Pont nylon brushes for 5 years.

Chongqing CDB.jpg

Copyright: counterfeits must investigate Link: